General Contractor: Moss & Associates
Architect: MGE
Owner: Leon Medical Center
Location: Miami, FL

Description: This project consisted of the renovation of a 4 story building in order to incorporate medical offices and laboratory space within the facility.

General Contractor: The Weitz Company
Location:  Pompano Beach, FL
Completion Date: 10/01/16
Description:

The Woodlands at John Knox Village will be the first skilled nursing center in Florida to adopt The Green House model of care. The Woodlands will feature a total of seven floors and 144 private rooms. Six of the floors are residential living. The ground floor has a multi-purpose room, dining bistro and rehabilitation center. Each residential floor will have two Green House homes. Each home has 12 private bedrooms and bathrooms surrounding an open living room (hearth), kitchen and dining area.

General Contractor: ANF Group
Location: Plantation, FL
Completion Date: 10/01/2020

Description:

Baptist Health of Platantation is a 4-story, 114,000 sq.ft. medical office building located in Plantation, FL. This project consists of an Urgent Care Center, Diagnostic Center, Radiation Oncology Center, Ambulatory Surgical Center, Miami Orthopedic and Sports Medicine Institute, Physical Therapy, Primary Care Center, Medical Oncology / Infusion, and additional shell space for future expansion. In addition, the medical office building will be accompanied by a 422 space 4-story parking garage.

Owner: U.S. Army Corps of Engineers, Patrick Air Force Base, Fla.
Contractor: Hensel Phelps Construction, Orlando
Architect: HOK, Houston
Civil Engineer: Atkins (PBS&J), Melbourne, Fla.
Structural Engineer: Brittingham & Associates Structural Engineers, Norcross, Ga.
Civil Engineer: Critchfield Mechanical, San Jose, Calif.
Location: Doral, FL
Completion Date: 2011

Description: The four-story building includes 440,000 sq ft of office space, a command center and a 14,000-sq-ft data center.

https://www.youtube.com/@danielrourke4074/videos

General Contractor: Moss & Associates
Architect: HOK Architects, STH Architectural Group
Location: Belle Glade, FL

https://www.youtube.com/@danielrourke4074/videos

General Contractor: Pirtle Construction
Location: Miami, FL
Architect: AECOM
Completion Date: 

Description: This project is a shared facility between the City of Miami Police Department and Miami Dade County Public Schools. The four story building is utilized for grades 9-12. The site has classrooms, forensic labs, administration, kitchen/dining, gym, locker rooms, media center, auditorium, firing range, student dormitory and a pedestrian bridge for the Policing College. The site features include above ground storage tanks, bus drop off, covered walkway, landscaping, fencing, loading area, elevated plaza and all related support spaces.

General Contractor: Moss & Associates / Miller Construction
Location: Hollywood, FL
Completion Date: 2011

Description: This oceanographic research facility spans 86,000-square-feet and is located at the entrance channel to Port Everglades. The five story facility is a LEED silver project that will specialize in marine and coastal studies for NSU’s graduate students.

General Contractor: ANF Group
Architect: Cannon Design
Owner: Nova Southeastern University
Location: Davie, FL

Description: NSU Central plant is a 2 story 84,000 SqFt facility on the Davie Campus

General Contractor: JWR Construction
Location: Davie, FL
Owner: Nova Southeastern University

Description: The competition pool project features a top of the line complex with an aquatics facility, locker rooms, spectator stands, and training rooms. The pool is 50-meters and has a diving well.