General Contractor: Moss Construction
Location: Boynton Beach, FL
Owner: The School District of Palm Beach County
General Contractor: Moss Construction
Location: Boynton Beach, FL
Owner: The School District of Palm Beach County
General Contractor: Balfour Beatty
Location: Fort Lauderdale, FL
Owner: Broward County Construction Management
Completion Date: Current
Description: The Convention Center expansion project will add an additional 525,000+ square feet of meeting space and an upscale 800-room headquarters hotel. It takes full advantage of the amenities of this beautifully scenic location on the Intracoastal Waterway, focused on a mix of activities associated with the Intracoastal and nearby Port Everglades, consistently ranked as one of the three busiest cruise ports in the world. The total cost of the project is estimated to be in the neighborhood of $1 billion.
Owner: U.S. Army Corps of Engineers, Patrick Air Force Base, Fla.
Contractor: Hensel Phelps Construction, Orlando
Architect: HOK, Houston
Civil Engineer: Atkins (PBS&J), Melbourne, Fla.
Structural Engineer: Brittingham & Associates Structural Engineers, Norcross, Ga.
Civil Engineer: Critchfield Mechanical, San Jose, Calif.
Location: Doral, FL
Completion Date: 2011
Description: The four-story building includes 440,000 sq ft of office space, a command center and a 14,000-sq-ft data center.
General Contractor: Moss & Associates
Architect: HOK Architects, STH Architectural Group
Location: Belle Glade, FL
General Contractor: Pirtle Construction
Location: Miami, FL
Architect: AECOM
Completion Date:
Description: This project is a shared facility between the City of Miami Police Department and Miami Dade County Public Schools. The four story building is utilized for grades 9-12. The site has classrooms, forensic labs, administration, kitchen/dining, gym, locker rooms, media center, auditorium, firing range, student dormitory and a pedestrian bridge for the Policing College. The site features include above ground storage tanks, bus drop off, covered walkway, landscaping, fencing, loading area, elevated plaza and all related support spaces.
General Contractor: Stiles Construction
Location: Pembroke Pines, FL
Completion Date: March 2017
Description:
The 175,000-square-foot building features lots of high ceilings, wide-open areas and a 35,000-square-foot Great Hall that will host conventions, graduations and concerts. The floor is concrete with a clear epoxy coat, and there are 3,500 retractable seats.
General Contractor: Haskell Construction
Location: Boynton Beach, FL
Completion Date: 05/01/2020
Description:
The Boynton Beach Town Square redevelopment project is currently underway. The town square project is a 16 acre site that will include renovating the Boynton Beach High School into a culture center, residential and retail spaces. There will be a hotel, playgrounds, amphitheaters, open spaces, parking garages, a fire station, utility chiller plant and a new City Hall/Library.
General Contractor: Moss and Associates
Location: Sunrise, FL
Owner: Achievement & Rehabilitation Centers, Inc.
Completion Date: 04/27/2020
Description: The Project includes the build-out and equipping of approximately 8,000 square feet on the Arc Broward Regional campus in the City of Sunrise with teaching kitchen areas, classrooms, lecture/demo room, cooking and preparation areas, storage, refrigeration and related commercial kitchen equipment, technology and other furnishings and equipment. Arc Broward has been a catalyst for transformation by changing how people with developmental disabilities are included, enabling them to live, learn, work and play in their communities.
1329 Shotgun Road
Sunrise, FL 33326
Phone: 954.423.0000
Fax: 954.423.0668